|
BART PARKING STRUCTURE, HAYWARD, CA
|
Construction of a four level, 275,000 sf, 1,225 stall parking structure for the San Francisco Bay Area Rapid Transit District. Included one level of subterranean parking. Garage was poured-in-place concrete.
|
|
|
|
|
Owner: Bay Area Rapid Transit District
Architect: Robert Englekirk, Inc.
Design Build Parking Structure
4 Levels
1225 Stalls
270,000 suspended sf
|
|