> Return to projects page

Home Depot

+

100,000 square-foot retail warehouse with masonry block built over a closed landfill.  To accommodate the site, 628 piles were driven through the landfill to a depth of 160 feet.  The installation of a cathodic protection system and methane gas monitoring system was also required.  Because the project is located on a steep hillside, parts of the structure were formed over 40 feet in the air.  The project also includes a single deck, 40,000 square-foot parking structure.